Dynamo was retained to design, fabricate, and transport two (2) 8.5 m x 4.5 m control buildings for the Rover and Ridgeway Manitoba Hydro Stations.
A complete set of sealed drawings was supplied by Dynamo based on preliminary sample drawings submitted by Manitoba Hydro. The building construction consisted of a steel skid and internal HSS frame to support the cable tray system and self-framed pre-engineered envelope. The entire building was insulated with certified spray foam and then covered with ¾” T&G plywood and a steel liner. All work, including the electrical and mechanical systems, were completed at our Regina facility and overseen through virtual QA/QC visits from Manitoba Hydro representatives.