KEY PROJECTS
Dynamo completed the installation and commissioning of the Brine Pond Expansion Pump House electrical system. The scope consisted of the installation and commissioning of 25 kV and 5 kV cables, a 25–5 kV oil-filled transformer, 5 kV switchgear and associated pumps,
600 V cabling, switchgear and associated 600 V loads, as well as 208 V distribution, cable terminations, and cable testing.