SERVICES
The scope of work consisted of the design, fabrication, and supply of a 24.6 m x 7.3 m prefabricated walk in E-House installed at the Mosaic Potash Belle Plaine mine site...
SERVICES
Sectors
The scope of work consisted of the design, fabrication, and supply of a 24.6 m x 7.3 m prefabricated walk in E-House installed at the Mosaic Potash Belle Plaine mine site...
Dynamo was retained by FWS to complete the design-build of a new, high voltage substation for the plant expansion of the Richardson International Canola Crush facility near Yorkton, SK.
Dynamo was commissioned to evaluate the electrical distribution system at Viterra’s Thunder Bay grain handling facility and to make recommendations in order to upgrade it to a “Utility Grade” standard. One of the main recommendations from this study was to change out the existing medium voltage fused disconnect style switchgear with breaker switchgear.
Dynamo was retained to complete the electrical and instrumentation scope associated with a new cooling tower cell at the Yara facility in Belle Plaine, Saskatchewan.
After a fire destroyed Yara Belle Plaine’s Nitric Acid plant, Dynamo was retained to assess the extent of the damage and assist with devising a path forward to rebuild the facility.
Dynamo designed a greenfield substation and medium voltage distribution for a canola processing facility near Yorkton, SK.