PROJECT SUMMARY
Hoist drive upgrades at the Nutrien Allan Potash Mine had caused undesirable harmonic effects that resulted in vibration and damage to the existing production hoist transformers, eventually leading to failure...
PROJECT SUMMARY
SECTOR:
Mining
CLIENT:
Pentec Energy
DURATION OF PROJECT:
8 Months
PROJECT SUMMARY:
Nutrien is a Canadian fertilizer company headquartered in Saskatoon, Saskatchewan. It is the largest producer of potash and the third-largest producer of nitrogen fertilizer in the world. Nutrien produces and distributes over 25 million tonnes of potash, nitrogen and phosphate products for agricultural, industrial and feed customers worldwide.
Dynamo completed the installation and commissioning of the Brine Pond Expansion Pump House electrical system. The scope consisted of the installation and commissioning of 25 kV and 5 kV cables, a 25–5 kV oil-filled transformer, 5 kV switchgear and associated pumps, 600 V cabling, switchgear and associated 600 V loads, as well as 208 V distribution, cable terminations, and cable testing.
The project scope also included fibre optic services with approximately one hundred (100) terminations for the fire panel, motor relays, and switchgear connections, as well as one hundred (100) splices connecting underground fibre optic cables.
Recent Posts
Hoist drive upgrades at the Nutrien Allan Potash Mine had caused undesirable harmonic effects that resulted in vibration and damage to the existing production hoist transformers, eventually leading to failure...
Dynamo executed the electrical and civil work for the brownfield 72 kV station at the QE6 (Q3N) In-Line Breaker Substation located near Saskatoon, SK...
Dynamo was contracted to fabricate, ship, and install a
16 m x 7.3 m switchgear building for the Parkridge Station in Regina, SK. The project was guided by a complete set of sealed drawings developed by Dynamo based on preliminary designs from SaskPower..