PROJECT SUMMARY

Burner Controls Panel Design and Supply

  • TCP After 2.jpg
  • TCP After.jpg
  • TCP Before.jpeg


SECTOR: 
Food


CLIENT: 

Thunder Creek Pork


DURATION OF PROJECT:

3 Months


PROJECT SUMMARY:

Dynamo was retained to design a new controls interface for the main burner system at the Thunder Creek Pork facility in Moose Jaw, Saskatchewan.  A combination of existing and new equipment was used to complete the design.


Dynamo performed the work on-site during a planned shutdown.  Some existing cables were re-purposed, but the majority were replaced with new cables and heat shields.


Dynamo successfully commissioned the upgrade and assisted the client with process start-up.

Recent Posts

The T17 transformer at the Chemtrade Logistics’ plant in Brandon, MB had developed several leaks over its service life. Several gasketed and sealed components developed leaks resulting in an increased risk to the asset as well as potential environmental concerns...

The T5 rectifier transformer at the Chemtrade Logistics’ plant in Brandon, MB had developed several moderate leaks over its service life resulting in an increased risk to the asset as well as potential environmental concerns.

The University of Saskatchewan Preston Substation Upgrade Project consisted of upgrading all site equipment to migrate the facility from the current 72 kV primary voltage to 138 kV...