PROJECT SUMMARY

Burner Controls Panel Design and Supply

  • TCP After 2.jpg
  • TCP After.jpg
  • TCP Before.jpeg


SECTOR: 
Food


CLIENT: 

Thunder Creek Pork


DURATION OF PROJECT:

3 Months


PROJECT SUMMARY:

Dynamo was retained to design a new controls interface for the main burner system at the Thunder Creek Pork facility in Moose Jaw, Saskatchewan.  A combination of existing and new equipment was used to complete the design.


Dynamo performed the work on-site during a planned shutdown.  Some existing cables were re-purposed, but the majority were replaced with new cables and heat shields.


Dynamo successfully commissioned the upgrade and assisted the client with process start-up.