Dynamo was retained by FWS to complete the design-build of a new, high voltage substation for the plant expansion of the Richardson International Canola Crush facility near Yorkton, SK.
SERVICES
Sectors
Dynamo was retained by FWS to complete the design-build of a new, high voltage substation for the plant expansion of the Richardson International Canola Crush facility near Yorkton, SK.
Dynamo was commissioned to evaluate the electrical distribution system at Viterra’s Thunder Bay grain handling facility and to make recommendations in order to upgrade it to a “Utility Grade” standard. One of the main recommendations from this study was to change out the existing medium voltage fused disconnect style switchgear with breaker switchgear.
Dynamo was retained to complete the electrical and instrumentation scope associated with a new cooling tower cell at the Yara facility in Belle Plaine, Saskatchewan.
Dynamo designed a greenfield substation and medium voltage distribution for a canola processing facility near Yorkton, SK.
Dynamo was retained to fabricate, ship, and install a 9.6 m x 4.5 m control building for the Grenfell Substation. Drawings were supplied by Dynamo based on a preliminary design provided by SaskPower.
Dynamo was contracted to execute a 138 kV substation expansion and 25 kV capacitor addition to ABB’s Static Var Compensation installation at SaskPower’s Points North Substation.