The University of Saskatchewan Preston Substation Upgrade Project consisted of upgrading all site equipment to migrate the facility from the current 72 kV primary voltage to 138 kV...
SECTORS
Sectors
The University of Saskatchewan Preston Substation Upgrade Project consisted of upgrading all site equipment to migrate the facility from the current 72 kV primary voltage to 138 kV...
Dynamo has successfully completed substation steel fabrication and on-site structure erection including aluminum bus work at multiple greenfield and brownfield locations for SaskPower since 2010.
Dynamo was contracted to execute a 138 kV substation expansion and 25 kV capacitor addition to ABB’s Static Var Compensation installation at SaskPower’s Points North Substation.
Dynamo was retained to remove seven (7) 230 kV air circuit breakers and current transformers (CTs) and replace them with new SF6 live tank circuit breakers and CTs.
Dynamo has successfully completed substation steel fabrication and on-site structure erection including aluminum bus work at multiple greenfield and brownfield locations for SaskPower since 2010.
Dynamo was retained to complete upgrades to the Pasqua Switching Station.