SERVICES
The scope of work consisted of the design, fabrication, and supply of a 24.6 m x 7.3 m prefabricated walk in E-House installed at the Mosaic Potash Belle Plaine mine site...
SERVICES
Sectors
The scope of work consisted of the design, fabrication, and supply of a 24.6 m x 7.3 m prefabricated walk in E-House installed at the Mosaic Potash Belle Plaine mine site...
Dynamo was commissioned to evaluate the electrical distribution system at Viterra’s Thunder Bay grain handling facility and to make recommendations in order to upgrade it to a “Utility Grade” standard. One of the main recommendations from this study was to change out the existing medium voltage fused disconnect style switchgear with breaker switchgear.
Dynamo designed a greenfield substation and medium voltage distribution for a canola processing facility near Yorkton, SK.
Dynamo was retained to fabricate, ship, and install a 9.6 m x 4.5 m control building for the Grenfell Substation. Drawings were supplied by Dynamo based on a preliminary design provided by SaskPower.
Dynamo has successfully completed substation steel fabrication and on-site structure erection including aluminum bus work at multiple greenfield and brownfield locations for SaskPower since 2010.
Dynamo was contracted to execute a 138 kV substation expansion and 25 kV capacitor addition to ABB’s Static Var Compensation installation at SaskPower’s Points North Substation.