PROJECT SUMMARY

Cooling Tower Electrical Design and Installation

  • 2_2100 VFD.jpg
  • 1_Cooling Towers.jpg
  • Op Station.jpg
  • 3_MCC 85NVN6.jpg

 

SECTOR: 
Agriculture

 

CLIENT: 

International Cooling Tower

 

DURATION OF PROJECT:

3 Months

 

PROJECT SUMMARY:

Dynamo was retained to complete the electrical and instrumentation scope associated with a new cooling tower cell at the Yara facility in Belle Plaine, Saskatchewan.

 

The engineering scope included design of the interface between the VFD, DCS, and field devices; specification of the power and control cabling; programming of the VFD for the application; and producing a final report including new and updated as-built CAD drawings. Both extensive offline and online testing were performed to optimize operation and control of the new cooling tower.

 

The construction scope included installation of a new 200 HP VFD into Sub #1, a new operator station local to the motor, 225 meters of new 600 V / 3c 350 MCM motor cables, all control and communication wiring between the VFD and DCS, additions to the lighting and lightning systems on the cooling tower, and modification of the MCC feeder section with a new line reactor and door venting.

Recent Posts

Hoist drive upgrades at the Nutrien Allan Potash Mine had caused undesirable harmonic effects that resulted in vibration and damage to the existing production hoist transformers, eventually leading to failure...

Dynamo executed the electrical and civil work for the brownfield 72 kV station at the QE6 (Q3N) In-Line Breaker Substation located near Saskatoon, SK...

Dynamo was contracted to fabricate, ship, and install a
16 m x 7.3 m switchgear building for the Parkridge Station in Regina, SK. The project was guided by a complete set of sealed drawings developed by Dynamo based on preliminary designs from SaskPower..