PROJECT SUMMARY

Design, Supply, Install, and Commission Drum Scraper

  • Drum Scraper Before.jpg
  • Drum Scraper After 1.jpg
  • Drum Scraper After 3.jpg


SECTOR: 
Steel


CLIENT: 

EVRAZ Inc. NA


DURATION OF PROJECT:

3 Months


PROJECT SUMMARY:

Evraz NA is a global steel and mining company and the leading producer of infrastructure steel products in North America. They are among the top 30 steel producers in the world and own and operate major assets in Russia and North America.


Dynamo reverse engineered an existing control cabinet and repurposed it to control a newly designed drum scraper test set.


Once the design was completed and approved by the client, Dynamo constructed a new back pan for the panel, installed a blank cover plate on the door, and completed all on-site commissioning.

Recent Posts

Dynamo was retained to complete the decommissioning and disposal of one (1) 20 MVA transformer, BU-410-TX-1 and one (1) high voltage oil circuit breaker, BU-410-TX-1-OCB at the Bethune Station and one (1) 20 MVA transformer, ZP-420-TX-2 at the Loreburn Station.