PROJECT SUMMARY
SECTOR:
Steel
CLIENT:
EVRAZ Inc. NA
DURATION OF PROJECT:
5 Months
PROJECT SUMMARY:
Evraz NA is a global steel and mining company and the leading producer of infrastructure steel products in North America. They are among the top 30 steel producers in the world and own and operate major assets in Russia and North America.
Dynamo was retained to remove an existing Allen Bradley PLC 5 system and replace it with a new Allen Bradley Control Logix 5000. All IFC drawings were created and supplied by the client.
Dynamo performed installation of all client supplied equipment, re-wired the existing cabinet, all field devices, conducted all QA/QC, and assisted with commissioning.
Recent Posts
Hoist drive upgrades at the Nutrien Allan Potash Mine had caused undesirable harmonic effects that resulted in vibration and damage to the existing production hoist transformers, eventually leading to failure...
Dynamo executed the electrical and civil work for the brownfield 72 kV station at the QE6 (Q3N) In-Line Breaker Substation located near Saskatoon, SK...
Dynamo was contracted to fabricate, ship, and install a
16 m x 7.3 m switchgear building for the Parkridge Station in Regina, SK. The project was guided by a complete set of sealed drawings developed by Dynamo based on preliminary designs from SaskPower..