PROJECT SUMMARY
The T5 rectifier transformer at the Chemtrade Logistics’ plant in Brandon, MB had developed several moderate leaks over its service life resulting in an increased risk to the asset as well as potential environmental concerns.
PROJECT SUMMARY
SECTOR:
Steel
CLIENT:
EVRAZ Inc. NA
DURATION OF PROJECT:
9 Months
PROJECT SUMMARY:
Evraz NA is a global steel and mining company and the leading producer of infrastructure steel products in North America. They are among the top 30 steel producers in the world and own and operate major assets in Russia and North America.
Dynamo was engaged to provide electrical engineering support, material procurement services, construction, and technical commissioning. The project presented an extremely time-sensitive and ambitious schedule. Our scope covered all aspects of the electrical works including project management, high voltage distribution, low voltage distribution, automated machinery wiring, and motor control center fabrication; custom metal fabrication, installation with onsite welding services; commissioning of the electrical distribution equipment along with controls commissioning assistance for the entire pipe coating process.
From breaking ground in November 2015 to realizing a 250,000-square-foot operating facility with more than 70 km of electrical cable installed by July of 2016 was a truly remarkable undertaking.
Recent Posts
The T5 rectifier transformer at the Chemtrade Logistics’ plant in Brandon, MB had developed several moderate leaks over its service life resulting in an increased risk to the asset as well as potential environmental concerns.
The University of Saskatchewan Preston Substation Upgrade Project consisted of upgrading all site equipment to migrate the facility from the current 72 kV primary voltage to 138 kV...
The scope of work consisted of the design, fabrication, and supply of a 24.6 m x 7.3 m prefabricated walk in E-House installed at the Mosaic Potash Belle Plaine mine site...