PROJECT SUMMARY

Generator Load Bank Design-Build

  • 02_20220828_162833-1.jpg
  • 20221216_144156.jpg
  • 01_20221216_131933-1.jpg
  • 20220828_173901.jpg
  • 20221216_144140.jpg
  • 03_20220828_162852-1.jpg
  • 04_20221216_144121-1.jpg

 

SECTOR:

Renewables

 

CLIENT: 

Meadow Lake OSB

 

DURATION OF PROJECT:

2 Weeks

 

PROJECT SUMMARY:

 

Dynamo Engineering completed a comprehensive study and then procured the necessary materials to implement a design-build option for the installation of an adequately sized, permanent load bank to be used for routine testing of the on-site standby back-up generator.

Recent Posts

Hoist drive upgrades at the Nutrien Allan Potash Mine had caused undesirable harmonic effects that resulted in vibration and damage to the existing production hoist transformers, eventually leading to failure...

Dynamo executed the electrical and civil work for the brownfield 72 kV station at the QE6 (Q3N) In-Line Breaker Substation located near Saskatoon, SK...

Dynamo was contracted to fabricate, ship, and install a
16 m x 7.3 m switchgear building for the Parkridge Station in Regina, SK. The project was guided by a complete set of sealed drawings developed by Dynamo based on preliminary designs from SaskPower..