PROJECT SUMMARY
Hoist drive upgrades at the Nutrien Allan Potash Mine had caused undesirable harmonic effects that resulted in vibration and damage to the existing production hoist transformers, eventually leading to failure...
PROJECT SUMMARY
SECTOR:
Oil & Gas
CLIENT:
Enbridge
DURATION OF PROJECT:
2 Weeks
PROJECT SUMMARY:
Enbridge is a multinational energy company headquartered in Canada. It owns and operates pipelines throughout Canada and the United States, transporting crude oil, natural gas, and natural gas liquids. Their expansive pipeline system is the longest in North America moving nearly 25% of all the crude oil produced there.
Dynamo completed electrical and civil deficiencies resulting from the L3R project. Tasks included cable management, cathodic grounding, clean-up and washdown of all pumphouses, widening of the roadway, ditch markings, and structural modifications to existing the stairwell.
Recent Posts
Hoist drive upgrades at the Nutrien Allan Potash Mine had caused undesirable harmonic effects that resulted in vibration and damage to the existing production hoist transformers, eventually leading to failure...
Dynamo executed the electrical and civil work for the brownfield 72 kV station at the QE6 (Q3N) In-Line Breaker Substation located near Saskatoon, SK...
Dynamo was contracted to fabricate, ship, and install a
16 m x 7.3 m switchgear building for the Parkridge Station in Regina, SK. The project was guided by a complete set of sealed drawings developed by Dynamo based on preliminary designs from SaskPower..