PROJECT SUMMARY

Loreburn L3R Deficiencies

  • IMG_6070.jpg
  • 612461703.jpg
  • 612461684.jpg

 

SECTOR: 
Oil & Gas

 

CLIENT: 

Enbridge

 

DURATION OF PROJECT:

2 Weeks

 

PROJECT SUMMARY:

Enbridge is a multinational energy company headquartered in Canada.  It owns and operates pipelines throughout Canada and the United States, transporting crude oil, natural gas, and natural gas liquids.  Their expansive pipeline system is the longest in North America moving nearly 25% of all the crude oil produced there.

 

Dynamo completed electrical and civil deficiencies resulting from the L3R project.  Tasks included cable management, cathodic grounding, clean-up and washdown of all pumphouses, widening of the roadway, ditch markings, and structural modifications to existing the stairwell.

Recent Posts

Dynamo was retained to complete the decommissioning and disposal of one (1) 20 MVA transformer, BU-410-TX-1 and one (1) high voltage oil circuit breaker, BU-410-TX-1-OCB at the Bethune Station and one (1) 20 MVA transformer, ZP-420-TX-2 at the Loreburn Station.