PROJECT SUMMARY

Pasqua Switching Station Works

  • IMG_1331.JPG
  • IMG_1338.JPG
  • BA703CT-2.JPG


SECTOR: 
Utilities


CLIENT: 

SaskPower


DURATION OF PROJECT:

8 Months


PROJECT SUMMARY:


SaskPower is the electric utility in Saskatchewan. Established nearly 100 years ago they s, they serve over 500,000 customers and manage over $10 billion in assets. 


Dynamo was retained to complete upgrades to the Pasqua Switching Station. The scope of work included grounding, installation of new underground ducts, as well as the replacement, wiring and testing of five (5) circuit breakers, five (5) sets of current transformers, fourteen (14) switches, and four (4) LM switches.


All removal, replacement, commissioning, and energization took place in a brownfield station setting.

Recent Posts

Hoist drive upgrades at the Nutrien Allan Potash Mine had caused undesirable harmonic effects that resulted in vibration and damage to the existing production hoist transformers, eventually leading to failure...

Dynamo executed the electrical and civil work for the brownfield 72 kV station at the QE6 (Q3N) In-Line Breaker Substation located near Saskatoon, SK...

Dynamo was contracted to fabricate, ship, and install a
16 m x 7.3 m switchgear building for the Parkridge Station in Regina, SK. The project was guided by a complete set of sealed drawings developed by Dynamo based on preliminary designs from SaskPower..