PROJECT SUMMARY

Pennant and Ponteix 400 kW Solar Farms

  • IMG_20180313_115508.jpg
  • screen_11cb0018b0d6d496_1516738499059.jpg
  • IMG_20180303_173611.jpg
  • screen_732a230a7f234742_1516738580058.jpg
  • IMG_20171221_142640.jpg
  • IMG_20171221_143850.jpg


SECTOR: 

Renewables


CLIENT: 

Grace Energy


DURATION OF PROJECT:

3 Months


PROJECT SUMMARY:


Grace Energy is an Alberta based solar and wind company founded in 2010.  They design, supply and construct renewable energy projects throughout Western Canada. Their 2 MW DC solar energy installation in 2015 was the largest installation of its kind in Alberta at that time, establishing them as leaders in the field of renewable energy projects.


Dynamo was retained to perform all required engineering and design requirements to meet all utility needs including plans review, grounding and bonding design, cable routing and cable capacities.

All electrical construction, interconnection, and energization was completed by Dynamo.

Recent Posts

Dynamo was retained to complete the decommissioning and disposal of one (1) 20 MVA transformer, BU-410-TX-1 and one (1) high voltage oil circuit breaker, BU-410-TX-1-OCB at the Bethune Station and one (1) 20 MVA transformer, ZP-420-TX-2 at the Loreburn Station.