PROJECT SUMMARY
Hoist drive upgrades at the Nutrien Allan Potash Mine had caused undesirable harmonic effects that resulted in vibration and damage to the existing production hoist transformers, eventually leading to failure...
PROJECT SUMMARY
SECTOR:
Agriculture
CLIENT:
FWS Industrial
DURATION OF PROJECT:
16 Months
PROJECT SUMMARY:
Dynamo was retained by FWS to complete the design-build of a new, high voltage substation for the plant expansion of the Richardson International Canola Crush facility near Yorkton, SK.
When apparent that North American suppliers were unable to meet delivery timelines required for the second phase of the expansion, which included the supply of padmount distribution transformers, Dynamo worked with Daelim Electric out of China to offer transformers with Canadian approvals within the required timelines. Dynamo also worked with IGARD to offer neutral grounding transformers to be mounted on these units at site. Dynamo was awarded the supply and installation of these units. The designs were completed with adequate supports from the NGRs. These were received and mounted on site by Dynamo personnel.
Recent Posts
Hoist drive upgrades at the Nutrien Allan Potash Mine had caused undesirable harmonic effects that resulted in vibration and damage to the existing production hoist transformers, eventually leading to failure...
Dynamo executed the electrical and civil work for the brownfield 72 kV station at the QE6 (Q3N) In-Line Breaker Substation located near Saskatoon, SK...
Dynamo was contracted to fabricate, ship, and install a
16 m x 7.3 m switchgear building for the Parkridge Station in Regina, SK. The project was guided by a complete set of sealed drawings developed by Dynamo based on preliminary designs from SaskPower..