PROJECT SUMMARY
Hoist drive upgrades at the Nutrien Allan Potash Mine had caused undesirable harmonic effects that resulted in vibration and damage to the existing production hoist transformers, eventually leading to failure...
PROJECT SUMMARY
SECTOR:
Utilities
CLIENT:
ILJIN Electric Company
DURATION OF PROJECT:
N/A
PROJECT SUMMARY:
Iljin Electric is a Korean company specializing in electrical transmission and distribution equipment. They produce transformers, switchgear, cable, and other specialized components to ensure a safe and stable supply of electricity to industrial and utility companies around the world.
Dynamo was retained by ILJIN Electric Company to complete the assembly, vacuum drying, vacuum filling, and complete electrical testing of various transformers supplied to SaskPower and used throughout the province of Saskatchewan. This particular contract consisted of 15/20/25 MVA, 138–25 kV transformers.
Some of the utility project sites include Estevan East Substation, Points North Switching Station, and Shaunavon Substation.
Recent Posts
Hoist drive upgrades at the Nutrien Allan Potash Mine had caused undesirable harmonic effects that resulted in vibration and damage to the existing production hoist transformers, eventually leading to failure...
Dynamo executed the electrical and civil work for the brownfield 72 kV station at the QE6 (Q3N) In-Line Breaker Substation located near Saskatoon, SK...
Dynamo was contracted to fabricate, ship, and install a
16 m x 7.3 m switchgear building for the Parkridge Station in Regina, SK. The project was guided by a complete set of sealed drawings developed by Dynamo based on preliminary designs from SaskPower..