PROJECT SUMMARY

Modular E-House Fabrication

  • 2_Dynamo - Modular E-House Mosaic Belle Plaine-3 Drone.jpg
  • 1_Dynamo - Modular E-House Mosaic Belle Plaine-29.jpg
  • 3_Dynamo - Modular E-House Mosaic Belle Plaine-21.jpg
  • 4_Dynamo - Modular E-House Mosaic Belle Plaine-14.jpg
  • 5_Installed pic 1 - use this one.jpg


SECTOR: 
Agriculture


CLIENT: 

Mosaic Potash Belle Plaine


DURATION OF PROJECT:

11 Months


PROJECT SUMMARY:


The scope of work consisted of the design, fabrication, and supply of a 24.6 m x 7.3 m prefabricated walk in
E-House installed at the Mosaic Potash Belle Plaine mine site. The steel skid was covered with a 100% welded, 5/16" thick checker plate floor and all steel received a white blast cleaning to SSPC-SP5/NACE No. 1 before being coated with three (3) layers of protective paint. The skid was insulated with 2 lb closed-cell medium density polyurethane foam and covered with a 26-gauge stainless steel liner.


The building erected on this skid was a structural steel skeleton design with a 16-gauge steel stud frame and two (2) layers of drywall on the exterior and interior to achieve the 2-hour fire rating requirement. The exterior was wrapped with a synthetic waterproof membrane and covered with a fibreglass reinforced panel on the walls and roof. This E-House was built to withstand the extremely corrosive potash mine environment.

Recent Posts

The T5 rectifier transformer at the Chemtrade Logistics’ plant in Brandon, MB had developed several moderate leaks over its service life resulting in an increased risk to the asset as well as potential environmental concerns.

The University of Saskatchewan Preston Substation Upgrade Project consisted of upgrading all site equipment to migrate the facility from the current 72 kV primary voltage to 138 kV...

The scope of work consisted of the design, fabrication, and supply of a 24.6 m x 7.3 m prefabricated walk in E-House installed at the Mosaic Potash Belle Plaine mine site...