The primary objective of the Utility Power Upgrade Project was to install two (2) three-winding 230 kV power transformers to carry the site load and allow de-energization of the existing 72–4.16 kV substation.
SERVICES
Sectors
The primary objective of the Utility Power Upgrade Project was to install two (2) three-winding 230 kV power transformers to carry the site load and allow de-energization of the existing 72–4.16 kV substation.
The primary objective of the Utility Power Upgrade Project was to install two (2) three-winding 138 kV power transformers to carry the site load and allow de-energization of the existing 72–4.16 kV substation.
Dynamo completed a design-build 138 kV substation for the Clavet II Crush Plant Project at Cargill’s Clavet, SK facility.
Dynamo completed a design-build of a new 138 kV client-owned substation with a unique 138 kV underground transmission line designed to provide additional clearance for site operations.
Dynamo was awarded the opportunity to supply a 20’ sea container E-House to HudBay Minerals in Snow Lake, Manitoba.
Dynamo completed a design-build 138 kV substation as part of the Melt Shop expansion project at the Regina facility. Deliverables included detailed engineering, installation of all piles, foundations, then fabrication and installation of structural steel, and steel pile caps.