SERVICES
Dynamo was retained to remove seven (7) 230 kV air circuit breakers and current transformers (CTs) and replace them with new SF6 live tank circuit breakers and CTs.
SERVICES
Sectors
Dynamo was retained to remove seven (7) 230 kV air circuit breakers and current transformers (CTs) and replace them with new SF6 live tank circuit breakers and CTs.
Dynamo has successfully completed substation steel fabrication and on-site structure erection including aluminum bus work at multiple greenfield and brownfield locations for SaskPower since 2010.
Dynamo was retained to complete upgrades to the Pasqua Switching Station.
Dynamo was retained to complete a 138 kV and 230 kV expansion in a brownfield setting, to the Kennedy Switching Station.
Dynamo completed electrical and civil deficiencies resulting from the L3R project. Tasks included cable management, cathodic grounding, clean-up and washdown of all pumphouses, widening of the roadway, ditch markings, and structural modifications to existing the stairwell.
Dynamo was contracted to execute a 138 kV substation expansion and 25 kV capacitor addition to ABB’s Static Var Compensation installation at SaskPower’s Points North Substation.