SERVICES
Dynamo was originally retained by Yara to perform a scoping study to evaluate present and future loading requirements. Based on future plant increases and aging electrical infrastructure, the study recommended the installation of two (2) new, fully redundant 138–13.8 kV transformers and a new 13.8 kV switchgear line-up.